Postingan

CSM Dataset and Detailed Results

This site hosts the full datasets and per-instance results for all methods evaluated, including the proposed Cost–Supply Method (CSM) and baselines (VAM, JHM, TOCM-MT, BCE, SSM). For each instance you’ll find the Initial Basic Feasible Solution (IBFS) cost, the Deviation (DV) from the known optimum, and the Accuracy Percentage (AP) indicators. Detailed for each dataset     IBFS Results , Deviation percentage (DV) from the known optimum, and the Accuracy Percentage (AP) each IBFS on each datasets   Runntime for each method and numerical example

Dataset and Supplementary Table RBSM

Full 42 Numerical Examples (Paper, Synthetic data, and Real case)   Supplementary Table

Dataset TA Rihan Farih Bunyamin - CSM

Gambar
 Berikut ini adalah tabel lengkap dari dataset Tugas Akhir "Perhitungan Initial Basic Feasible Solution Pada Transportation Problem dengan Menggunakan Cost Supply Method (CSM)" Video Pengerjaan :  https://youtu.be/rBPzbL0wvRo Dataset CSM: No Referensi Nama TP Ukuran TP Nilai Optimal Matriks 1 (Ramadan, 2012) N01 3x3 5600 [ Cij ]3x3 = [32 40 120; 60 68 104; 200 80 60] [Si]3x1 = [20 30 45] [ Dj ]1x3 = [30 35 30] 2 (Samuel, 2012) N02 3x4 28 [ Cij ]3x4 = [1 2 3 4; 4 3 2 0; 0 2 2 1] [Si]3x1 = [6 8 10] [ Dj ]1x3 = [4 6 8 6]   3 (Imam et al., 2009) N03 3x4 435 [ Cij ]3x4 = [10 2 20 11; 12 7 9 20; 4 14 16 18] [Si]3x1 = [15 25 10] [ Dj ]1x4 = [5 15 15 15]   4 (Kaur et al., 2018) N04 ...